Returnees / Balikbayans | Announcements | Awards & Recognition | FAQ | Contacts
Power Systems Technician
Employer: Saudi Arabian Oil Company (Saudi Aramco)
Category: Technical Work - Oil, Gas & Petro-Chemical
Work Location: Saudi Arabia
Posting duration: Dec 10, 2012 - Mar 10, 2013
Gender: Male
   
Please see additional instructions for Saudi Aramco applicants

Qualifications:
  • Have completed a Power System Specialty Course plus one of the following: ESO Specialty, Power Services Specialty, or Power Line/Cable Specialty
  • 13 years of experience in Power Distribution System installation, testing, commissioning, Trouble shooting, repairs and maintenance.

Task Description:
  • Completes command over using and analyzing the test results obtained from Doble tester, Hi-Pot tester, Oscilloscopes, Thermo-vision camera, TTR, Winding resistance tester, Meggers, Phasing out tester, Oil filtering machine and other test equipment used in the Power Services unit.
  • Diagnosing and resolving most day-to-day distribution system faults and maintenance problems
  • Operating, commissioning, testing, repair and maintenance of power distribution equipment with rated voltage of 4.16 kV to 230kV.
  • Supervises multiple crews at the same time in distance separated facilities, these will range from 20 to 30 facilities and the number of employees ranges from 15 to 30 employees.
  • Leads and directs safety meetings with the crew and ensures strict compliance with approved safety practices, PDI instructions and Saudi Aramco standards.
  • Investigates major system faults and equipment failures and prepares the preliminary report of the incident.
  • Conducts frequent Safety Audits and Quality checks with proper interventions. Report findings and recommendations to the unit and division heads.
  • Leads and directs senior technicians in conducting testing and maintenance of different power system equipment using three phase current injection sets, logic analyzers, Oscilloscopes, Doble tester, Hi-Pot tester, Thermo-vision camera, Oil Filtering machine, Cable Test Van and other testing equipment.
  • Maintains record for all test reports, establish trend record for different power system equipment tested by Doble tester, hi-Pot tester and thermo-vision camera.
  • Directs, search and obtain all necessary spare parts required for the maintenance and repair of all equipment under the maintenance of the areas of operation.
  • Receives directions and discuss work schedules from the unit head and division head, obtain outages and coordinates work with Maintenance, Project Management Teams, Operations and Construction organizations during T&I and mega projects.
  • Recommends design changes and improvements to the division head for equipment operation, reliability, maintenance practices, troubleshooting techniques and training of the lower classified technicians.
  • Works as unit head when required.

Apply for this job:

 
Email address:
Password:
 
 
 
 

Be Informed!

  • Emirates Airline Final Interview

    Final Assessment June 22, 2013 (Saturday)
    Final Interview June 23 - 24, 2013 (Sunday - Monday)
    IPAMS Office

    Positions Involved:
    Cabin Services Assistant (CSA/BD/18771)

    No...
  • RasGas Company Ltd. Final Interview

    Date: June 18 - 19, 2013 (Tuesday - Wednesday)
    IPAMS Office

    Positions Involved:
    Fire Fighter Officer
    Emergency Medical Technician
    EMS Officer II

    Walk-in applicants will...
  • HEMPEL Paints W.L.L Final Interview

    Date: 3rd Week of August 2013
    IPAMS Office

    Positions Involved:
    Floor Coating Specialist (Bahrain)
    Decour Paint Applicator (Saudi Arabia)

    Walk-in applicants will be...
  • PESO Job Fair (Olongapo City)

    Date: June 19, 2013 (8am - 5pm Wednesday)
    Rizal Triangle Court
    Olongapo City
  • dnata Assessment and Final Interview (Postponed)

    Assesment and Final interview has been moved to August 2013. Exact dates will be announced soon.
    IPAMS Office

    Positions Involved:
    Ramp Service and Cargo Handling Assistant

    No...
  • Overseas Workers Program (OWP) Premium Mandatory Membership

    The Philhealth Board had approved the new premium contributions for all membership categories to more accurate and sustainable levels, way back in 2011.

    Based on current and expected benefit...
  • Sharaf Group Final Interview (Postponed)

    Date: To be announced
    IPAMS Office

    Positions Involved:
    Adventure HQ (Dubai)
    Sales Advisor (Land)
    Sales Advisor (Bike)
    Bike Mechanic

    Forever 21 (KSA)
    Store...
  • Saudi Chevron Final Interview

    Date: To be announced soon
    IPAMS Office

    Position Involved:
    Process Operators (Levels 4-5) and Senior Process Operator

    Note: Selection process will be 2-3 days to cover the...
  • YASREF Recruitment Campaign

    Date: To be announced soon

    Positions Involved:
    Electrical Technician
    Mechanical Technician
    Instrument Technician
    Plant Mechanic
    DCS Operator
    Shift Supervisor...
  • IPAMS has moved!

    IPAMS Building 723 Aurora Blvd., New Manila, Quezon City 1112
    (between Hemady Ave. and Balete Drive; in front of Robinsons Magnolia Mall)

    See Contacts page for more info.

Show All